12th Floor:
* Looked great, didn't see anything of note
11th Floor:
* Sticker on the wall near unit 1110
* Near the elevator 2 lights burn't out
10th Floor:
* Some garbage in the hallway near the elevator
9th Floor:
* Garbage in the South Stairwell
* Exit sign near the elevator is bent towards the ceiling
8th Floor
* There is a white, glass door sitting in the North Stairwell
7th Floor:
* Paint on the back of the South Stairwell door. Paint on the floor in the stairwell towards 6th floor South Tower
* Scuffs on the wall near elevator and missing smoke detector
6th Floor:
* White dirt (construction debris?) on the floor
* Missing smoke detector near unit 607
5th Floor:
* Back of the South Stairwell door has graffiti etched in it that says something like "I have feelings"
* Trail of dirt/debris leading directly from unit 502 to the elevator.
4th Floor:
* Garbage outside suite 401
3rd Floor:
* Baseboard missing outside the site office
2nd Floor (South Stairwell)
* Welcome mat sitting in the stairwell
General Concerns
* Elevator B2 had garbage in it
* Vandalism of the Bulletin Boards
Overall I was pleasantly surprised and my general observation was that everything looked better than the last walk-through. I think the recent patches done to the walls have made a huge difference - hopefully they'll also be painted, which will make the hallways look even better.
nice work Alden we've still
nice work Alden
we've still gotta organize those walkarounds and introductions though!